Outdoor full color: P4, P5, P6, P8, P10
Indoor full color: P2, p2.5, P3, P4, P5
Led small spacing: P1.25, P1.47, P1.56, P1.667, P1.875, P1.923
The full-color LED display screen has developed to a mature stage from technology, production, and application, and by 2017, the full-color LED display market is still growing at 25% per year. The application scope of full-color LED display screen has penetrated into various industries, including government agencies, enterprises, airports, hotels, sports, media, and many other fields, and has been recognized by the public There is no full-color LED display in the venue, so there is a certain discount in terms of promotion effect and grade.
Full color LED display includes many types and models of products, which is divided into:
Outdoor full color: P4, P5, P6, P8, P10
Indoor full color: P2, p2.5, P3, P4, P5
Led small spacing: P1.25, P1.47, P1.56, P1.667, P1.875, P1.923
Led rental screen: P3.91, P4.81
Preparation work of full color LED display screen scheme construction,
1) It is required to meet the power consumption requirements of LED display screen project the user is responsible for laying the power supply line to the display installation site,
2) It needs to pass the original structure safety assessment of relevant departments,
3) The steel structure of LED display screen (including scaffold, lighting in steel structure, laying strong and weak current cables into steel structure).
4) LED display screen must be fireproof, that is, it has a flame retardant function;
5) According to the construction period specified in the contract, make full preparation for production, technology, personnel, and materials, and ensure the delivery to the designated place on time to complete the installation and testing of relevant equipment.
6) Based on the contract related technical indicators and part of the industry standards as the principle, formulate a detailed quality assurance plan to ensure high quality and efficient performance of the contract.
7) Formulate strict safety assurance measures, eliminate all personal and equipment liability accidents, and ensure zero accident rate during installation and construction.
8) Scientific management, orderly production, unity and cooperation, multi-party cooperation, environmental protection and original facilities, clean and tidy site.
9) Comply with the national regulations on environmental protection to ensure no pollution and no damage to the site environment.
Basic requirements of full color LED display project
(1). The provider shall give the first and bran-new instrumentality needed by the purchasers, and meet the relevant quality standards projected by the state and users.
(2). All product should be in condition while not harm throughout the open box review, and also the configuration shall be per the packing list. the amount, quality, and performance shall not be not up to the wants during this bidding document.
Led screen pack
(3). the looks of the instrumentality is clean, and also the mark variety and also the font on the surface area unit clear and clear.
(4). For the mandatory parts poignant the traditional operation of the instrumentality, whether or not it’s realized within the technical specifications or not, the provider shall give them and clearly list them within the tender documents.
(5). Before the junction rectifier monitor enters the location for installation, it should give the light-emitting tube import declaration type, certificate of origin, and take a look at report.
(6). If the instrumentality provided by the bidder at the time of bidding has been obsolete (not enclosed within the manufacturer’s product series at that time), if it fails to produce the instrumentality with corresponding or higher configuration at the first value, it shall be treated as a breach of contract.
(7). The bidder shall be tortured per relevant laws and laws if it’s found that merchandise} provided by the bidder fail to get the tax payment certificate of foreign products or fail to fulfill the relevant necessities within the bidding documents and also the bidding documents.
(8). The provider shall give annual when-sales service and technical support freed from charge after installation and acceptance.
(9). The merchandise used should be constant batch, and no batch or package is allowed.
(10). outside P8 full-color junction rectifier show could be a business demand, to make sure the standard and repair life
(11). extraordinary the budget are going to be considered invalid.